Skip to main content
Smart Configuration
E
Written by Engineering
Updated today

1. Configuration

Go to Project > Smart Config, click Configuration.

You can create wired and wireless VLANs, and perform ACL, AP VLAN, and WAN configurations on the displayed page.

Click To Configure under the item that you want to configure. You will be redirected to the corresponding configuration page.

Network Access Control configuration is used as an example to illustrate the configuration steps.

First, click To configure. The Network Access Control page is displayed. On the page that is displayed, click To configure to start the configuration.


You can use this Network Access Control feature to assign a service network to the Interworking Zone or the Isolation Zone, depending on the access control rights you want to assign to this service network.

Service networks in the Interworking Zone can access each other,while those in the Isolation Zone cannot.

Service networks in the Interneworking Zone cannot access those in the Isolation Zone, and vice versa.

You can restrict the access control rights of a service network by dragging it from the Interworking Zone to the Isolation Zone, and then clicking Save.

By clicking No IP under a service network in the Isolation Zone, you can set an IP address or an IP address range that is allowed to access this service network.

2. Optimization

On the Optimization page, you can configure features such as Wi-Fi optimization, loop prevention, DHCP snooping, and ARP spoofing guard.

Click To configure under the item that you want to configure. You will be redirected to the corresponding configuration page.

WIO configuration is used as an example to illustrate the configuration steps.

First, click To Configure. The WIO page is displayed. On the page that is displayed, click Enable Wi-Fi Optimization, and then click Optimize Now.

The system will perform the network optimization. After the optimization is complete, you can check the results by scrolling down the page.

You can set the time for scheduled optimization by clicking Optimization Schedule, and then clicking Save to save the configuration.

3. Delivery

Click Delivery to perform a network-wide smart check, view reports, and update devices. Under the item you want to configure, click To Configure. You will be redirected to the corresponding configuration page.

Delivery Report is used as an example to illustrate the configuration steps.

First, click To Configure to view the latest delivery report of the current project.

Click Edit at the upper right corner to edit basic information in the project report.

Did this answer your question?